Surefoot designed and installed  a complete bridge foundation to provide a temporary route for road traffic to cross while a further road bridge was being replaced and to later serve as a foot bridge in what is a private estate. The solution was installed with bearer beams and steel assemblies in 3 days along the existing bridge, once installed the old bridge was lifted out and the new one lifted in during a single operation.