Steel and timber sign structures

Large Steel mono post or multi post signage structures are subject to large bending moment loads. Foundations bases on Surefoot have the capacity to resist these loads without the need for the Deep holes associated with concrete footings with the same capacity. In this example 4 x Surefoot SF600 units with 16 micro pile tubes per base are combined with a steel sub structure/grillage to exponencially increase system capacity and resist the 210kn bending moment loads of the mast and screen. Each Surefoot unit weighs a mere 40kg and takes little more than 45 minutos to install each footing. The entire foundations and structure was erected in a single day.

Contact us with details of your structure and typical foundation requirements and our engineers will offer a custom solution.

Project details

Client
Various

Dates
2011- ongoing