Lewis house – Self build

Surefoot provided the foundations for low energy 2 story timber frame self build in Crewe. The system included a precise threaded bar height adjustment to faciliate the levelling of the floor structure. The entire foundation was ready in less than 3 days and the carpenters immedatley started to assemble the floor system. Extra thick high tensile steel piles were used to achieve a long design life. The client realized cost savings in access of £10.000 on this particular build.