A mining infrastructure project to provide accommodation, gymnasium, canteens and storage facilities for hundreds of employees. The Surefoot foundation for the gym building of over 200m2 was installed in a single day with 3 people and without the use of heavy machinery. The accommodation blocks have prefabricated concrete floor systems weighing in at over 20 tonnes per module. A total of 400 Surefoot bases were used throughout the Project and the total installation time was approximately 1 week. In this particular application considerable cost savings were realised by not using concrete.

Client
Mining company

Date
2012