Go to Top

Orange homes UK

A typical Surefoot application. The client was building a home office suite in his back garden with very restricted access via a narrow passage through a terraced workshop. The entire foundation and installation equipment was carried through by hand and the foundation set up and installed in 2 days.  12 x Surefoot SF100 units were used in this scenario as the soil was extremely poor. The system was installed on unlevelled ground and Surefoot provided a steel post system, leaving a perfectly level platform to build off.