Temporary infrastructure

Temporary bridge

In this case study, a temporary bridge was required to gain access to forested areas for their exploitation. Surefoot SF300 units were installed with custom attachement pillars to recieve the steel elements of the bridge system. The solution delivered the required capacity for heavy machinery and transport trucks to access the previously unreachable area.

Surefoot can be used to realize any form of temporary infrastructure in military, humanitarian and disaster response applications. It provides the solidity of permanent installations combined with a removable and reusable foundations system.  It can also be used as an anchor system with exceptional capacity.

Project details

Client
Private

Date
2011